Choose, plan, install and control

Electric Underfloor Heating Advice

Start with the floor finish and free heated area, then work through output, build-up, controls and electrical requirements before selecting a product.

Use this hub to find the right guide for each stage of an electric underfloor heating project.

→
New to electric underfloor heating?

Follow the four-step route below. If the room has an unusual shape, mixed finishes or limited electrical capacity, send Uheat the details before ordering.

Start here

Four steps from floor finish to tested system

01

Choose the route

Compare mat, cable, foil, membrane and in-screed options.

02

Measure free area

Exclude fixed obstructions and draw the cable route.

03

Confirm the design

Check output, layers, limits, control and electrical load.

04

Install and test

Follow the current manual and retain readings and certificates.

Content owner: Uheat technical teamLast reviewed: August 2026

Where electric often fits

Individual rooms and smaller renovation areas

Bathrooms, kitchens and other defined zones can suit electric systems where a thin build-up and independent control are useful. The room heat loss, free heated area, floor finish and electrical capacity still need to be checked.

What to send Uheat

Give us the information needed for an assisted recommendation

  • A dimensioned plan showing permanent units and thermostat position
  • The exact finish, underlay and proposed subfloor build-up
  • The free heated area and preferred cable or mat route
  • Room type, insulation and whether heating is primary or supplementary
  • Any circuit or electrical-load information from your electrician

Not sure where to start?

Use the Selector or Ask for an Assisted Recommendation

Send the room plan, free heated area and floor finish so Uheat can help narrow the system route before you order.