New ground floors
In-Screed Water Heating
A strong starting point when the extension includes a new slab and screed, particularly for larger open-plan ground-floor spaces.
Currently closed
Room & project guide
Choose a heating route that suits the new floor construction, available build-up and the way your extension will connect to the rest of the home.
Start with the floor
The right solution is driven by the construction—not simply the room name. Choose the route that most closely matches your planned floor.
New ground floors
A strong starting point when the extension includes a new slab and screed, particularly for larger open-plan ground-floor spaces.
Existing base floor
Overlay water heating or electric heating can suit projects where the structural floor is already in place and build-up must be controlled.
Upper floors
Lightweight water systems for first-floor extensions and suspended timber constructions where a full screed is not suitable.
| Comparison criteria | In Screed | Retrofit | Joisted Floors |
|---|---|---|---|
| Starting point | New slab or structural screed | Suitable existing structural floor | Timber or engineered joists |
| System position | Pipe embedded within the screed | Above the base and beneath the finish | Between or across the joists |
| Main priority | Efficient heating across a new floor area | Reduced disruption and controlled height | Low weight with a compatible floor build-up |
Electric alternatives
Electric heating can be a practical route for a self-contained room or where extending the water system is not appropriate. Match the system to the floor construction first.
Existing-floor electric option
Pre-spaced electric heating for regular-shaped extension floors
New screed electric option
An electric cable installed within a planned screed floor
Plan the complete extension
If water underfloor heating will connect to an existing heating system, the heat source, hydraulic design and controls must be checked as part of the project design.
Confirm whether the extension is screeded, timber joisted or built over an existing structural floor
For water heating, confirm that the boiler or heat pump and controls can support the additional load
Plan insulation and finished floor heights where the extension meets the existing building
Calculate room heat loss and decide whether the extension needs its own controllable heating zone