Straightforward installation
How AD-SLIM Is Installed
Plan the board layout and heating circuits together before installation. For manifold connections, testing and commissioning, read our water installation guide alongside the AD-SLIM system instructions.
- 1Confirm that the existing base is sound, clean, level and structurally suitable
- 2Plan the board layout, heating circuits and manifold connections
- 3Fix the AD-SLIM boards using the preparation and fixing method specified for the base
- 4Press the 12mm PERT heating pipe into the grooves, connect the circuits and complete pressure testing
- 5Install the required preparation or overboarding layer before the approved finished floor