Installation overview
How AD-EPS400 Is Installed
Plan the panel and pipe routes before fitting. Follow the project design and current installation instructions:
- 1Confirm heat loss, manifold position, circuit lengths, panel layout and the floor-finish build-up.
- 2Prepare a clean, dry, level and structurally suitable base.
- 3Fit the panels using the fixing, bonding or underlay method specified for the floor.
- 4Cut panels to fit, align the channels and apply the specified aluminium tape across joints.
- 5Press the 16 × 2mm pipe into the channels, following the planned circuit routes.
- 6Connect, fill and pressure-test before adding the approved preparation layer and floor finish.