How HeatBase Is Installed
Plan the cable route and floor sensor before bonding the membrane. Follow the current ELEKTRA DM cable instructions and the specified membrane, adhesive and floor-finish requirements throughout the work.
- 1Measure the free floor area to be heated, excluding permanent fittings and other restricted zones.
- 2Confirm the required cable length, membrane quantity, floor sensor position and complete floor build-up.
- 3Prepare a clean, dry, level and structurally suitable base, with any specified insulation beneath.
- 4Bond the HeatBase membrane with the specified flexible adhesive, keeping the cable channels aligned.
- 5Route the cable and floor sensor through the planned channels without cutting, crossing or overlapping the cable.
- 6Complete and record the required electrical tests, install the tiled finish, then arrange final connection with a qualified electrician.