Installed above the existing floor
The structural floor remains in place and the heating panels are fitted over a suitable, prepared surface.
Currently closed
LOW-PROFILE WATER HEATING
Add water underfloor heating above a suitable existing structural floor.
Overlay panels provide a practical route for renovations where lifting the floor or adding a traditional screed is not desirable. The correct board depends on available height, insulation and the intended floor finish.
OVERLAY BASICS
This construction is most useful when you want water underfloor heating without forming a new screed floor.
The structural floor remains in place and the heating panels are fitted over a suitable, prepared surface.
Different board constructions balance overall height, strength and insulation. The lowest build-up is not automatically the best option.
Tiles, engineered wood, laminate, vinyl and carpet can require different preparation above the heating system.
CURRENT UHEAT SYSTEMS
Use this comparison as a starting point, then confirm the complete floor build-up before ordering.
| System | Board construction | Typical strength | Best starting point |
|---|---|---|---|
| AD-CXPS | Cement-coated XPS | Robust and tile-ready | A durable all-round overlay system |
| AD-EPS400 | Foil-faced EPS400 | Lightweight with integral insulation | Projects that benefit from added insulation |
| AD-SLIM | High-density grooved board | Minimum-height option | Where every millimetre of floor build-up matters |
See the full overlay-system comparison for board depths, floor finishes and detailed construction guidance.
BEFORE YOU CHOOSE
An overlay board is only one layer in the finished construction.
Include the board, pipe, coverings, adhesive or levelling layer and final floor finish.
The base must be suitable, stable, level and prepared for the selected system.
Confirm the required output before choosing a board or pipe spacing.
Follow the limits and preparation requirements from the heating, board and flooring manufacturers.
COMMON QUESTIONS
Quick answers before comparing the available systems.
Not usually. Overlay systems are designed to sit above a suitable existing structural floor, but the base must be checked and prepared first.
AD-SLIM is the minimum-height option in the current Uheat range. The thinnest system is not always the best choice once insulation, strength and the final finish are considered.
That depends on the selected board and floor finish. Some finishes require an additional board, adhesive or self-levelling layer.